Reenskaug Hotel

General Manager Name: Kjetil Eide Mail: kjeti.eide@festningshotellene.no Phone: +47 905 73 877 Executive Chef Name: Irena Duczkowska Mail: kjokken.reenskaug@festningshotellene.no Phone: +47 939 93 176

Kongsvinger Festning

General Manager Name: Hanne Marte Strøm Vestlund Mail: hanne.marte@festningshotellene.no Phone: +47 458 60 016 Executive Chef Name: Tone Strøm Mail: tone.strom@festningshotellene.no Phone: +47 930 85 884

Oscarsborg Festning

General Manager Name: Denise Kocaman Mail: denise.kocaman@festningshotellene.no Phone: +47 923 13 200 Food and Beverage Director Name: Stian Anderssen Mail: stian.anderssen@festningshotellene.no Phone: +47 994 32 100 Chief Engineer Name: Husse Kocaman Mail: husse.kocaman@festningshotellene.no Phone: +47 905 24 438 Executive Chef Name: Hristo Atanasov Mail: kjokken@oscarsborghotel.no Phone: +47 925 06 891

Job description for Bus Person in Restaurants

JOB TITLE: Bus Person REPORTS TO: Restaurant Manager / Supervisor POSITION SUMMARY: A Bus Person He / She is responsible to set and clears restaurant tables, stocks all service stations and assist food servers with table service to ensure total guest satisfaction. Quickly clear dirty table settings and prepare table for resetting. Promptly and consistently reset all service ware as prescribed. BUS PERSON …

Job description for Bus Person in Restaurants Read More »

Job Description for Kitchen Steward / Dishwasher

POSITION TITLE: Steward / Dishwasher REPORTS TO: Chief Steward / Executive Chef POSITION SUMMARY: Primarily Responsible for Operating and maintain cleaning equipment and tools. Also responsible for washing dishes, china ware, flatware, cutlery, crockery, kitchen vessels, sweeping  and mopping floors, cleaning and detailing equipment’s etc. Maintains the kitchen, dish washing and back area in an inspection-ready condition in …

Job Description for Kitchen Steward / Dishwasher Read More »

Standard Operating Procedure for Engineering Preventive Maintenance

SOP Number: Hotel Engineering SOP  – 01 Department: Engineering and Maintenance Date Issued: 01–Feb-2018 Time to Train: 45 Minutes Engineering Preventive Maintenance Standard Procedure: The main purpose of the preventive maintenance SOP is to reduce the downtime of all equipment used in the hotel by minimising mechanical failures, breakdown, operation and also its running cost. In order to ensure that equipment is serviced according to the …

Standard Operating Procedure for Engineering Preventive Maintenance Read More »

Standard Operating Procedure for Engineering – Ken Fix-It

SOP Number: Hotel Engineering SOP  – 02 Department: Engineering and Maintenance Date Issued: 04–Feb-2018 Time to Train: 30 Minutes Engineering Ken Fix It Standard Procedure: The main purpose of the Ken Fix It SOP is to ensure that guest rooms and public area are maintained in excellent conditions at all times. As a rule of thumb, one full-time Ken fix-it mechanic is required per 200 …

Standard Operating Procedure for Engineering – Ken Fix-It Read More »

Standard Operating Procedure for Engineering Boiler Operation

SOP Number: Hotel Engineering SOP  – 03 Department: Engineering and Maintenance Date Issued: 10–Feb-2018 Time to Train: 30 Minutes Engineering Boiler Operation Standard Procedure: The main purpose of the Boiler operation SOP is to ensure that the hotel boiler is maintained in excellent conditions and hot water supply is available to all guestrooms and public areas. 1) Fill the feed water in the …

Standard Operating Procedure for Engineering Boiler Operation Read More »

Standard Operating Procedure for Dish Washing Machine Maintenance Checklist

SOP Number: Hotel Engineering SOP  – 06 Department: Engineering and Maintenance Date Issued: 15–Feb-2018 Time to Train: 30 Minutes Dish Washing Machine Maintenance Checklist and Procedure: Required Tools: Plier. Screwdriver. Clamp meter. Tester. Air Blower. Crimping tool. Oil Cane. Brush. Greasing Gun. Spanner Set. Cleaning Cloths. Consumable Parts: PVC Tape. Carbon. Removing. Compound. Old Clothes. Oil & Grease. WD-40. Maintenance Activity …

Standard Operating Procedure for Dish Washing Machine Maintenance Checklist Read More »

Standard Operating Procedure for Double Door Cooling Cabinet Checklist

SOP Number: Hotel Engineering SOP  – 07 Department: Engineering and Maintenance Date Issued: 16–Feb-2018 Time to Train: 30 Minutes Double Door Cooling Cabinet Maintenance Checklist and Procedure: Required Tools: Screwdriver. Plier. Clamp. Meter. Wire Brush. Crimping tool.  Greasing Gun. Oil Cane.  Line Tester. Spanner set. Soap solution. Consumable Parts: PVC Tape. Old clothes. Carbon removing Compound. Soap solution. Maintenance Activity: Condenser Motor …

Standard Operating Procedure for Double Door Cooling Cabinet Checklist Read More »

Rull til toppen